PacketUpload

Don't let a missing photo delay you by weeks.

Catch it before the crew leaves — not weeks later when rework, resubmissions, or held payment are already on your desk.

For ops and compliance teams done eating the cost of failures caught too late to fix cheaply.

52%
of project rework traces to documentation gaps — not execution errors.
Source: Autodesk & FMI — Construction Disconnected
$1,000
true cost of a single truck roll once labor, vehicle, and lost productivity are counted.
Source: TSIA via S&C Electric
71%
industry-median field service first-time fix rate. Nearly 1 in 3 dispatches fail the first try.
Source: Aberdeen Research
90%
of solar interconnection applications contain errors requiring revision.
Source: GreenLancer — Interconnection Guide
18.1%
of commercial vehicles were placed out of service at the 2025 International Roadcheck — defects a proper DVIR should have caught at pre-trip.
Source: CVSA — 2025 International Roadcheck Results
35.6%
of collision repairs now require ADAS calibration — most arriving as supplements, not on the initial estimate.
Source: CCC Crash Course — Q4 2025

One platform. Every packet. Zero rework.

The compliance spec changes by vertical. The workflow hole we fill doesn't. Nine verticals already wired — same validation core, same first-pass guarantee.

Capture. Review. Close. No redlines.

The spec changes by industry. The mechanics don't. We enforce compliance at the edge — where the photo is taken — not in a back-office exception queue three weeks later.

01 — Capture

Field crews upload via guided, compliance-specific checklists

Smart prompts load the right checklist by site — PG&E Rule 21 tags in NorCal, 49 CFR 396.11 items on a pre-trip, FEMA PA Cat F documentation at a storm site. Crews can't close the job until the packet is complete.

02 — Review

AI cross-references uploads against compliance requirements in real time

SLDs matched to installed equipment, tread depth checked against 49 CFR 393.75, supplement line items verified against OEM labor times. Defects flagged with the exact field and correction — while the crew is still on site.

03 — Close

Back office receives a verified, audit-ready packet

One-click export in the format the utility, insurer, or regulator expects — PowerClerk-clean for solar, PA-portal-ready for storm response, FMCSA-aligned for fleet. No redline loops. No secondary truck rolls.

Tell us which workflow costs you most.

Walk us through the workflow where documentation rework hits hardest — we'll scope a pilot and come back within two business days.

Tell us your industry, the specific workflow, team size, and what's slipping through the cracks today. Prioritizing mid-market to enterprise ops teams with real compliance exposure.

Request access

Or email us directly at join@packetupload.com